Update on traffic disruptions around Purdue and Greater Lafayette

WEST LAFAYETTE, Ind. — A Purdue University Physical Facilities report offers updates on traffic and parking disruptions on and around the West Lafayette campus.

On campus

Reminder: The Y-shaped intersection near Elliott Hall of Music and the Armory is now a three-way stop.

Reminder: On Saturday, July 4th, campus traffic will be congested and parking restricted in some areas for the 2009 Stars and Stripes Celebration and Fireworks at Slayter Center for the Performing Arts. For details and a downloadable map, see http://www.lafayette-online.com/arts-entertainment/2009/06/2009-stars-and-stripes/

At the Gatewood Wing construction site alongside the Mechanical Engineering Building, the approach route for heavy vehicles is now from the intersection of State Street and Marsteller Street, coming north. In the area near Stanley Coulter Hall, pedestrians are to use the west part of Centennial Mall. Construction traffic will use the east part, nearer Wetherill Laboratory. Small golf cart-type vehicles are to avoid both.

Gatewood Wing work in the next two weeks is to include 1) timber lagging; 2) continuing mass excavation. For continued updates and information about this project, go to www.purdue.edu/architect/about/construction/2734.htm.

Parking garage cleaning: At the south half of the University Street Garage, cleaning is to continue through Thursday (July 2). Work is being done from 10:30 p.m. to 7 a.m. Next is the north half of the Northwestern Avenue Garage, scheduled for July 5-20.

State Road 26 West between County roads 300 West (Klondike Road) and 500 West will close July 6 and remain closed until late fall for a sight distance improvement project at both intersections (SR 26 and CR 300W, and SR 26 and CR 500W), both of which will be closed.

State Road 26 West between County roads 300 West (Klondike Road) and 500 West will close July 6 and remain closed until late fall for a sight distance improvement project at both intersections (SR 26 and CR 300W, and SR 26 and CR 500W), both of which will be closed.

Off Campus

State Road 26 West between County roads 300 West (Klondike Road) and 500 West will close July 6 and remain closed until late fall for a sight distance improvement project at both intersections (SR 26 and CR 300W, and SR 26 and CR 500W), both of which will be closed. Vehicles on CR 400W will be able to cross SR 26. Residents along the closed section of SR 26 will have access to their homes. Map (closure locations are approximate): www.purdue.edu/physicalfacilities/travel/pdf/SR26_map.pdf.

The southbound off ramp from Interstate 65 at State Road 43 is to be closed for reconstruction of the ramp. This is at exit 178. The closure may continue until July 13. The detour exit for southbound I-65 is to use Exit 188, go east on State Road 18, then south on State Road 43. This announcement is from the Indiana Department of Transportation (INDOT).

In Related News:

Comments are closed.

Greater Lafayette Community Calendar

 October 2019
SMTWTFS
293012345
6789101112
13141516171819
20212223242526
272829303112